That done, we pulled five lengths of plastic plumbing pipes up through the boxed-in section around the soil-stack. These pipes will connect the boiler to the hot water tank (which we lugged upstairs and into position), and to a header tank in the loft.
Rob the painter had brought his girlfriend's nephew along for the day. Nice young lad from Waneroo, the next-door suburb of Perth to Joondalup, where Mal and Michele have ended up. Small world, and nice to be carrying on the Aussie input to the project in a small way. He helped Rob with a bit of sanding and painting, and fitted a couple of doors to the kitchen units. Made a decent job, too. Shame he's set on joining the army. I'm sure Mal could have sorted him out with a job when he leaves school next year!
With the plumbing done (or rather, our supply of pipe exhausted), Melvin and I made a bit of a hash of fitting the cooker-hood, and will need to finish the job and touch up any damaged paint-work on the ceiling tomorrow, although with sunshine forecast, the cladding will take priority. Should finish it tomorrow, which is rather exciting.
281107 |
No comments:
Post a Comment