Revolting weather again today, so Melvin and I continued with the kitchen. I had a re-jig of the design last night, and came up with a layout that made more efficient use of the units we have, and avoids a weird arrangement in the corner by the fridge. Assembled the remaining units and fitted them, all screwed together and braced to the back wall. Cutting the worktops went very smoothly, despite both of us having a bit of nerviness about it. A big cut-out for the ceramic sink and an accurate end-cut where the worktops joined were done with a jig-saw and a router respectively. The router was one I managed to scrounge from SKS Joinery in the village, as neither of the ones we had would accept the cutter that came with the worktop jig. Practiced and honed our technique on an offcut before tackling the butt-joint. Very pleased with the end result.
I also hung out the windows and fitted a couple of slates at the back and one at the front. Much better forecast tomorrow, so we should be back on the cladding.
Rob's flying through the painting, and is almost finished upstairs.
No comments:
Post a Comment