I started with an unpleasant and long-avoided bit of plumbing under the floor, running the pipes in for the utility-room taps. Uncomfortable and fiddly, but it felt great to have it finished.
I'd nipped into Kelso in the morning for a stop-cock, which I installed with a temporary length of 15mm pipe on the down-stream side which I'll use to test all my plumbing before putting the oak flooring down.
The entire afternoon was spent tidying, sweeping and chipping plaster-spots from the downstairs floor to give us a smooth surface on which to lay the oak boards. The place was a real tip - evidence of Melvin's long absence. He's always the one to get hacked off with the mess and sort it all out.
Neil popped by in the evening and promised to be on site first thing tomorrow to hook me up to the spring supply temporarily. I have a feeling that he's done nothing about having the mains supply connected, and is a bit evasive whenever I mention it! Still, the spring will be fine for testing the plumbing.
281207 |