After several weeks of wondering vaguely what to floor it with, and wanting to avoid using ugly and pretty toxic decking, I bought a load of 150 x 32mm larch boards from Willie Dobie. They're planed with about 20 small longitudinal grooves across the 150mm width to provide grip when they're wet, and, being larch, should theoretically be OK to leave untreated. In the interests of keeping them clean I'm planning to oil them thoroughly so they can be washed down, and so water can be swept off them.
While Connor was busy with that, I was indoors cracking on with the second-fix electrics (fitting sockets and switches). I'm hoping to have it complete before the man comes to fit the meter on Friday, although the way the day-job has gone in the last couple of week, I'll be lucky to find the time.
We finished the day working together for the last hour, with Connor cutting boards to length and me fitting them with a 5mm gap between rows to aid water-shedding.
I bit the bullet this afternoon and phoned a couple of plumbers to take the heating system installation off my hands. Neither can fit it in this side of the new year, and I think it's going to be a bit of a panic getting the flooring done thoughout the house. Hopefully I'll be able to get the pipework in most of the house tested in the next week or two so I can make a start.
171207 |
No comments:
Post a Comment