December 24th:
Installed the last smoke alarm, the kitchen downlighters (above the island and in the bulkhead) and the upstairs ring-main sockets, apart from in Hamish's room because I ran out of back-boxes. Somehow - and I need to check my invoices to see what's happened - I've ended up with 80 extra single-gang back-boxes and a shortfall of two-gang. As the job only used about a dozen single-gang, it's difficult to see how I managed to procure almost a hundred! Still, as they cost about 30p each, it's hardly worth agonising over.
December 26th:
Hadn't intended to work on the house today, but after lunch I decided to nip over to the plot, take the dog for a run up Hownam Law, feed the horse and donkey and do a little bit of work. The run was wonderful - very windy and invigorating, and a relief to see that despite the lack of training over the last six months, I can still make it to the top without walking or suffering a coronary.
With the couple of hours I had available to work, I cut and installed the spindles on the upper flight of stairs. Made a pretty smart job of it, if I do say so myself, and I think it'll look rather natty when it's all oiled up.
I also marked out the hob cut-out on the island worktop, but decided that cutting it would take too much strength out of it, and would be better left until we've stopped flipping it over for oiling and moving it around.
Strawbale House
This blog is intended to chart our progress through the self-build process, from half-hearted plot-hunting through to completion of the build. The twist is that we're building the house from timber and straw (hence the blog title).
Click on the image at the end of each post to see that day's photos.
Click on the image at the end of each post to see that day's photos.
Wednesday, 26 December 2007