The installation and connection of our electricity meter was scheduled for today, and all morning I worked in a state of impatient expectation, waiting for it to turn up. I finished the upstairs lighting circuit, including a wire to switch the lounge lights that somehow I'd neglected to run in while the walls were open. Managed to get it in with no disturbance to decor. Connor cut as much verandah flooring as he could, then oiled a couple of worktops and set to work painting the front of the house, once the frost had melted from the wall in the soft, bright sunshine.
Anna came with the twins for a brief visit, during which they made an improvised slide with a couple of sheets of frosted OSB, ending at the edge of an open trench, into which they'd plummet at the end of each ride.
The meter-man turned up just after lunch and was finished within half-an-hour. When he'd gone I hooked the supply up to the fusebox and, with a mixture of trepidation and excitement, switched on. It seemed like a big moment, and work will now be a lot easier with lighting throughout the house (still to test upstairs) and sockets in handy places.
Connor finished the front wall, which makes a heck of a difference to the first impression the house gives as you approach it. Feels like things are coming together. All I need now is to sort the plumbing...
211207 |
No comments:
Post a Comment