Yet another pristine Autumn day, chilly with a lovely soft sun. Melvin carried on where he left off last week with the framing and sheeting around the waterfall window, and I set Crispin to work nailing battens to the outside walls, on which the cladding will be mounted. Good worker, requiring virtually no direction. He had his newest toy - a broadcast-quality video camera with him, and shot some video that may someday make it onto the blog.
I was very pleasantly surprised how much work he got through, fitting battens to the east end to verandah-roof level, all of the front wall and part of the west end. I worked with him for a while, then headed up to the roof, where I undercoated the finials and fitted the zinc ridge-flashing. It looks very nifty, although the first rain-shower will dull it down a lot.
291007 |
No comments:
Post a Comment