I briefly wondered if the scaffold towers might have been a false economy, bearing in mind the time spent moving them from place to place. I then remembered martin Warrall, who's approaching the end of a timber-clad SIPs self-build telling me that he ended up forking out SIX GRAND on scaffold hire. That's ten times what I paid to buy my kit, and at least I'll own it at the end of the job. Should come in handy for maintenance, painting fascias, replacing broken slates etc.
Strange being on site with no Mals or Melvins making a racket. Knocked off about 5:30 with the scaffold built but not yet braced to the building. Thinking of asking Davy Beveridge or his sidekick Mark to give me a hand slating at the weekend if they're not busy.
Jim Jordan from Rembrand Timber rang to say that the flashing for the waterfall window had turned up, without his even ordering it. Wonder if I did? Anyway, it's a bonus as they quoted a 4-week lead-time about 10 days ago.
Put together drawings and spec for the stairs in the evening for a couple of local suppliers to quote against.
230807 |
No comments:
Post a Comment