Strawbale House
This blog is intended to chart our progress through the self-build process, from half-hearted plot-hunting through to completion of the build. The twist is that we're building the house from timber and straw (hence the blog title).
Click on the image at the end of each post to see that day's photos.
Click on the image at the end of each post to see that day's photos.
Friday, 4 January 2008
January 4th - down-day
No work at the plot today, as Anna was working and I was on childcare detail. I did, however, splash out almost two grand on a boiler, flue and oil tank, which should arrive in about a week, and took delivery of the various traps and fittings that should enable me to crack on with the bathroom installations tomorrow. Also measured the loft floor-area so I can order the insulation. At 300mm (12") deep, it's going to cost around £400.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment