With the sheeting almost finished - probably about a day's work left on it - I asked Mal to get cracking on the verandah. I'd planned to finish the plumbing in the kitchen, but it was such a gorgeous warm sunny day that I decided that the verandah was the place to be. GZood decision, as we worked as a team throughout the day. I drilled and bolted down the post sockets onto their concrete pads while Mal prepared the posts for standing. Once all the posts were in place we started on the ring-beam. Mal cut the timbers and while he was working on the next, I was bolting the previous one to the uprights. I cut and fitted seven of the 14 floor-joists, before running out of timber. Somehow the 16 joists I ordered, and for which I have been invoiced, have turned into just seven on site. I suspect the remainder are still at Willie Dobie's sawmill.