A slow day slating the right-hand side of the waterfall window. There was quite a bit of calculation do sort out to make sure that I tied in correctly with the existing slating further up the roof. Very happy and relieved that it all worked out perfectly.
Anna was on site for a few hours, and completed the priming (i.e. the first of four coats) of the rear fascia while her mum tidied up around the place and burned a load of scraps of treated timber and OSB.
No comments:
Post a Comment