Just Mal and me again, and I was only there till lunchtime. Mal's decided to work weekends, but how long Michele will cope with that is open to question!
I had a good clear out upstairs and bagged up several sacks of firewood and a couple of rubbish. Mal was busy framing up the bathroom walls, and once he'd reached a point where I could, I pulled cables through from the ground-floor for the upstairs ring-main and lighting circuits.
The were some dwangs (yet more bloddy dwangs!) to measure and cut. These will be installed below the bathroom walls, between the first-floor joists, but I couldn't fit them today because we had only one nail-gun between us.
No comments:
Post a Comment